Sinohydro Co Ltd currently undertakes construction woks under LSP (CP1: sewer networks, pumping stations and trunk sewer pipeline) with a contract value of USD 33 million. As part of CP1, the upstream and downstream sections of Lusakas’ Western Interceptor sewer were upgraded (CSU2 and CSU1, trunk mains), whilst the intermediate section was initially omitted from the project. However, hydraulic models prepared as part of the overall program concluded, that the intermediate section was significantly undersized and would not accommodate flows expected within the design horizon.
After commencement of the main construction program, Lusaka Water and Sanitation Company (LWSC) decided that the gap between CSU1 and CSU2 trunk sewer pipeline should be constructed as part of LSP and contracted Sinohydro to undertake final design and implementation of CSU3 (2,310m of OD1200HDPE trunk sewer pipeline and associated man-holes). Subsequently, the Contractor appointed GOPA Infra to provide the necessary consulting engineering services.