Detailed design, construction quality management and support during the operation and maintenance period of the rehabilitation and upgrade of water and sewerage treatment Facilities in Chingola, Chililabombwe and Mufulira for MWSC

Project details
Country: 
Zambia
Donor organisation: 
Department: 
Water
Project volume: 
1,600,000 €
Currency: 
Value of services: 
1,600,000 €
Start of project: 
January, 2021
End of project: 
July, 2024
Project description: 

Mulonga Water and Sewerage Company Ltd (MWSC) is the water supply and sanitation service provider in partso the Copperbelt Province of Zambia, serving the mining towns of Chingola, Chililabombwe and Mufulira. The MWSC received a loan from the European Investment Bank and AFD as part of the Zambia Water and Sanitation Project for the “Rehabilitation and Upgrade of Water and Sewerage Treatment Facilities” in the urban centres, serviced by MWSC.

Under this project various project components are designed and implemented covering the following scope:

  • Water treatment plant design and build;
  • Operations services for the Chingola Kafue water treatment plant;
  • Bulk water pipelines (approx.25 km of DI 450–1000mm);
  • Design and build;
  • Sewer pond rehabilitation design and build.

The design and build component is undertaken based on FIDIC Yellow Book Contract Conditions and will involve works at MWSC’s water treatment plants (WTP) in the three towns namely: Chililabombwe, Chingola and Mufulira.

Some treatment plants will require minor works such as replacement of electrical and mechanical equipment whereas others require extensive rehabilitation/ refurbishment of electrical and mechanical and, in some cases, structural elements of the treatment plants. The anticipated treatment plant capacities to be achieved by the project through rehabilitation and extensions are for Chililabombwe: Chililabombwe WTP: 57 Ml/d, Kamenza WTP: 14 Ml/d and Konkola WTP: 3.5 Ml/d (in total 74.5 Ml/d); for Chingola: Chingola Kafue WTP: 60 Ml/d; Mufulira: Kafue WTP: 14 Ml/d, MCM WTP: 17 Ml/d and Chibolya WTP: 26 Ml/d (in total 57 Ml/d).

The Kafue WTP at Chingola, presently operating at 40MLD requires refurbishment works at the existing facilities as well as an additional 20MLD minimum extension works.   

Service description: 

The Consultant’s scope of works covers the study, hydraulic / process / M+E and civil design, preparation of drawings technical specifications, BoQs and construction drawings for all works (water treatment plant rehabilitation and expansion wastewater treatment plant rehabilitation and expansion, storage facilities and primary transmission pipelines; geotechnical surveys, analyses, tests for foundation or other investigations). The Consultant will undertake the Environmental Impact Assessment for the project including environmental baseline studies, air and water quality tests, tests for soil contamination or any other tests required for the ESIA process, preparation of scoping report and ESIA Terms of Reference, liaison with ZEMA regarding comments and approval of ESIA Terms of Reference and preparation of ESIA Report for submission to ZEMA.

During the construction period the Consultant will provide the Client’s construction team with additional information and or clarifications on any designs and or documents prepared by the Consultant as required, update any completed design/ design document and assist the Client in the preparation of ‘As Built Drawings’. During the operations of the works, after the taking over the project by MWSC, the Consultant will provide limited part-time operation and maintenance support services. 

Currency: