Overall objective:
The programme’s objective is to improve the population’s living conditions and climate resilience and Jordan’s stability by providing secure access to water and sustainable wastewater treatment. The technical cooperation module will improve the performance of the three Jordanian water utilities and of the Water Authority of Jordan in terms of water supply as well as wastewater treatment and reuse. It will endeavour to reduce the physical and administrative water losses in selected water supply areas and ensure safe operation of wastewater treatment plants in the project region in permanent compliance with chemical, biological and physical minimum standards.
Specific objective:
Preparation of a Water and Wastewater Infrastructure Master Plan for Al-Karak Governorate
The contractor contributes to achieving the target indicator for output 5.1 described in this document. The overall objective is for a specialized engineering services firm to prepare a water and wastewater Master Plan and detailed hydraulic models for Al-Karak governorate. The scope of this consultancy is focused on providing sector-specific advice on the technical analysis of water and wastewater distribution and infrastructure in the Al-Karak governorate, prioritising repair and rehabilitation measures.
This plan is intended to assist the MWI, WAJ and AW with decisions on cost-effective resource allocation and capital investment priorities to meet municipal water needs through the year 2050, environmental sustainability, expected sanitary loads, sanitation solutions, projected sewers capacity, reuse of the treated sewage effluent (TSE) and effective operation and maintenance. It takes into consideration expected population growth, demand trends, expected water loss reductions as per the new NRW water strategy (2022-2040), and the suite of currently planned strategic projects, particularly the national conveyor project that is expected to contribute to the water supply within the planning period.